The ranges below come from Fixr, with one week added to the upper end of each range. They are national figures, not Imperial Finishes schedules.
| Scope | What it covers | Typical time |
|---|---|---|
| Cosmetic update | Cabinet refacing or painting, new fixtures | 1 to 3 weeks |
| Typical remodel | New cabinets, appliances and flooring | 6 to 13 weeks |
| Major remodel | Structural changes, relocated lines or custom cabinets | 3 to 8 months or more |
Source: Fixr, “How Long Does a Kitchen Remodel Take?”, by Dan Simms, . National figures. One week is added to the upper end of each range.
Typical timelines, not a guarantee. Actual timing depends on scope, materials, permits and the conditions found during the work.
The 6 to 12 week range does not include planning. Design, selections and ordering happen before that clock starts.